CIT333 TMA1

1 Project running overtime is considered as software _______
*Crises
*Delay
*Issues
*All of the above

2 The Computer system has ______major components
*Three
*One
*Five
*Two

3 A ________ is a sequence of instruction which the computer follows to perform a given task.
*Game
*System
*Program
*Sequence

4 System _______ helps to run the computer hardware and the entire computer system.
*System
*Solution
*Software
*Sequence

5 Software efficiency is considered as software crises
*TRUE
*FALSE
*Unsure
*None of the above

6 ______ software offers tools to assist a programmer in writing programs, and software using different programming languages in a more convenient way.
*Building
*Construction
*Designing
*Programming

7 ______ software is a class of software which the user of computer needs to accomplish one or more definite tasks
*Digital
*Mobile
*Analog
*Application

8 ______ is the application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software, and the study of these approaches.
*System engineering
*Software engineering
*Software
*System

9 Software _________ is the elicitation, analysis, specification, and validation of requirements for software.
*Requirements
*Design
*Implementation
*Testing

10 Software ________ is the construction of software through the use of programming languages.
*Requirements
*Design
*Development
*Testing

11 ________ refers to Changes to software without increasing the complexity of the original system design should be possible.
*Maintainability
*Efficiency
*Reliability
*None of the above

12 ______ refers to the software system using the resources that are available in an optimal manner.
*Efficiency
*Maintainability
*Reliability
*None of the above

13 Low quality is also considered as software crises
*TRUE
*FALSE
*Unsure
*None of the above

14 Inability to meet software requirements is a software crises
*TRUE
*FALSE
*Unsure
*None of the above

15 A _______ engineer is an individual who applies the principles of software engineering to the design, development, testing, and evaluation of the software
*Game
*Software
*Graphic
*Mobile

16 ______ engineer Analyses information to determine, recommend, and plan computer specifications and layouts, and peripheral equipment modifications.
*Game
*Software
*Graphic
*Mobile

17 Software _____ was used to describe the impact of prompt increases in computer power and the difficulty of the problems which could be tackled.
*Crises
*Design
*Issues
*All of the above

18 Project not running over budget is considered as software crises
*TRUE
*FALSE
*Unsure
*None of the above

19 Aside user requirement analysis, another important aspect is the development process is the ______ part of the software product.
*Development
*Designing
*Implementation
*Analysis

20 One of the major tasks during system implementation is _____________ *Performing data testing before loading data into the system
*Performing data conversion before loading data into the system
*Performing conversion before loading into the system
*Performing data conversion before testing the system